04/06/21
Message Overview:
Message Description:
The Bleed Valve 1 is detected failed in open position. Check valve or position switch or wiring between the valve and the bleed/air condition panel.
Possible Causes:
- Bleed Valve 1 (Left Intermediate Pressure Valve) (V3)
- Data Concentrator Unit (DCU) (A14)
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin: None
Forum Articles/Infoservice/Newsletter: None
Quick Links:
| Operational Test of the Bleed Air System | AMM36-11-00-710-801 |
| Removal of the Intermediate Pressure Valve | AMM36-11-05-000-801 |
| Installation of the Intermediate Pressure Valve | AMM36-11-05-400-801 |
| Removal of the Data Concentrator Unit (DCU) | AMM31-41-01-000-802 |
| Installation of the Data Concentrator Unit (DCU) | AMM31-41-01-400-802 |
| Wiring - Maintenance Practices - ALL | SPM 20-12-00-02 |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10-02 |
Troubleshooting Recommendations:
- Make sure the L BLEED PBA is OFF
- Reset the L BLEED VALVES (V3) circuit breakers CB1-D15
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Do wiring checkbetween the left bleed valve (V3) and the ground. Repair as required.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Manually set the lever of the left bleed valve (V3) to OPEN and CLOSED, then do a continuity check between Pin 3 and Pin 4 of the connector V3J1.
- If there is continuity, go to step 6.
- If there is no continuity, continue with next step.
- Replace the left bleed valve.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Do the Operational Test of the Bleed Air System.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Do wiring check between the left bleed valve (V3) and the DCU Repair as required.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Replace the DCU.
- Do Close out.