03/02/21
Message Overview:
Message Description:
No L-GP-5 Bus data received at Spoiler Electronic Control Unit #2 (SECU #2).
Possible Causes:
- Spoiler Electronic-Control Unit 1 (SECU 1) (A118)
- Input/Output Concentrator Unit (IOC) No. 1 (A4-IOC1)
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin:
- AW300-27-0037 - Spoiler Electronic Control Unit (SECU) - Circuit Breaker Reset Procedure (20501 - 20999)
Forum Articles/Infoservice/Newsletter: None
- Reset SECU1 circuit breaker 'SPOILER CTRL 1' CBP1-B9 if any of the inboard MFS and GS #2, #4, #5 and #7 surface indication are amber or magenta.
- Reset SECU2 circuit breaker 'SPOILER CTRL 2' CBP2-B9 if any of the inboard MFS and GS #1, #3, #6 and #8 surface indication are amber or magenta.
NOTE: It is not permissible to cycle the SECU 1 or 2 circuit breakers in the air.
Quick Links:
| Removal of the Junction Box JB2 | AMM 24-63-05-000-803 |
| Installation of the Junction Box JB2 | AMM 24-63-05-400-803 |
| Functional Test of the Junction Box JB2 | AMM 24-63-05-720-801 |
| Removal of the Spoiler Electronic-Control Unit (SECU) | AMM 27-61-05-000-801 |
| Installation of the Spoiler Electronic-Control Unit (SECU) | AMM 27-61-05-400-801 |
| Electronic Rigging of the Spoiler Electronic-Control Unit (SECU) | AMM 27-61-05-820-801 |
| Electronic Rigging of the Spoiler Electronic-Control Unit (SECU) | AMM 27-61-05-820-802 |
| Removal of the Input/Output Concentrator Unit (IOC) | AMM 31-45-05-000-801 |
| Installation of the Input/Output Concentrator Unit (IOC) | AMM 31-45-05-400-801 |
| Operational Test of the Input/Output Concentrator Unit (IOC) | AMM 31-45-05-710-801 |
| Wiring - Maintenance Practices - ALL | SPM 20-12-00-02 |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10-02 |
| Electrical Connectors - Maintenance Practice - ALL | SPM 20-20-00-02 |
Troubleshooting Recommendations:
- Follow the circuit breakers reset procedure documented in AW300-27-0037.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Visually inspect SECU's and tray's connectors for damages. Repair/replace as required.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Swap SECUs.
- If system checks are good, do close out.
- If fault remains, continue with next step.
NOTE: An Electronic Rigging of the SECUs is necessary after a swap or a SECU replacement.
- Do wiring checks of the ARINC L-GP-5 data bus between SECU 1 connector A118AP1, Junction Box 2 and SECU 2 connector A119AP1. Repair/replace as required.
- If system checks are good, do close out.
- If fault remains, continue with next step.
- Replace Junction Box 2.
- Do close out.