06/03/19
Message Overview:
Fault Message:
[CPC1] SAFETY VALVE #2 /WRG
Fault Code:
2137427ABG
Associated CAS:
| Reporting LRU: | Cabin Pressure Controller (CPC) 1 |
| System Description: | 21-31-00 |
| Schematic Diagram: | 21-31-00 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wiring Diagram: | 21-31-03 [ Global Express ] [ G5000 ] [ Global XRS ] |
Fault Description:
The Safety Valve 2 is detected not fully closed.
Possible Causes:
- Safety Valve 2 (L11)
- Data Acquisition Unit (DAU) 2 (A18)
- Cabin Pressure Controller (CPC) 1 (A21)
- Cabin Pressure Controller (CPC) 1 Channel A
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin: None
Forum Articles/Infoservice/Newsletter: None
Quick Links:
| Removal of the Cabin Pressure Controllers | AMM 21-31-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Cabin Pressure Controllers | AMM 21-31-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Safety Valves | AMM 21-31-09-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Safety Valves | AMM 21-31-09-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Functional Test of the Safety Valves | AMM 21-31-09-720-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Data Acquisition Units (DAU) | AMM 31-42-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Data Acquisition Units (DAU) | AMM 31-42-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10 [ Global Express ] [ G5000 ] [ Global XRS ] |
Troubleshooting Recommendations:
NOTE: If the Cabin Maximum Differential pressure has been exceeded, disregard the troubleshooting below and investigate the pressurization system.
- Perform water leak check of the water system and perform a wiring checks of the bilge valve.
- If the wiring checks are not good, repair the defective associated wiring and do close out.
- If the wiring checks are good, continue with next step.
NOTE: Water spilled from the aft water system may disturb the static port airflow and consequently partially open the safety valves.
- Perform wiring checks of the wire between the Safety Valve 2 and DAU 2.
- If the wiring checks are not good, repair the defective associated wiring and do close out.
- If the wiring checks are good, continue with next step.
- Swap DAU 2 with DAU 1.
- If the system checks are good, replace the DAU 2 and do close out.
- If the fault remains, continue with next step.
- Replace CPC 1.
- Perform functional test of the safety valves.
- Do close out.