06/03/19
Message Overview:
Fault Message:
[CPC2] SAFETY VALVE #2 /WRG
Fault Code:
2138427ABG
Associated CAS:
| Reporting LRU: | Cabin Pressure Controller (CPC) 2 |
| System Description: | 21-31-00 |
| Schematic Diagram: | 21-31-00 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wiring Diagram: | 21-31-04 [ Global Express ] [ G5000 ] [ Global XRS ] |
Fault Description:
The Safety Valve 2 is detected not fully closed.
Possible Causes:
- Cabin Pressure Controller (CPC) 2 (A22)
- Data Acquisition Unit (DAU) 2 (A18)
- Safety Valve 2 (L11)
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin: None
Forum Articles/Infoservice/Newsletter: None
Quick Links:
| Removal of the Cabin Pressure Controllers | AMM 21-31-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Cabin Pressure Controllers | AMM 21-31-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Safety Valves | AMM 21-31-09-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Safety Valves | AMM 21-31-09-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Functional Test of the Safety Valves | AMM 21-31-09-720-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Data Acquisition Units (DAU) | AMM 31-42-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Data Acquisition Units (DAU) | AMM 31-42-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10 [ Global Express ] [ G5000 ] [ Global XRS ] |
Troubleshooting Recommendations:
NOTE: If the Cabin Maximum Differential pressure has been exceeded, disregard the troubleshooting below and investigate the pressurization system. Water spilled from the aft water system may disturb the static port airflow and consequently partially open the safety valves.
- Visually inspect for a water leak in the area of the static port.
- Swap DAU 2 with DAU 1.
- If system checks are good, replace DAU 2 and do close out.
- If fault remains, continue with next step.
- Perform wiring checks of the wire between the Safety Valve 2 and DAU 2.
- If wiring checks are good, continue with next step.
- If wiring checks are not good, repair defective associated wiring and do close out.
- Replace CPC 2.
- Perform functional test of the safety valves.
- Do close out.