02/16/21
Message Overview:
Message Name:
[ACSC1-A] LH FLOW CONT VLV CMD/FCV
Message Code:
2161321ECS
Associated CAS:
| Reporting LRU: | Air Conditioning System Controller (ACSC) 1 |
| System Description: | 21-51-00 21-52-00 |
| Schematic Diagram: | 21-52-00 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wiring Diagram: | 21-52-01 [ Global Express ] [ G5000 ] [ Global XRS ] |
Message Description:
The Left Flow Control Valve has been detected failed either in opened or closed position.
Possible Causes:
- Left Flow Control Valve (FCV) (L24)
- Compressor Pneumatic Overheat-Sensor (CPNOH)
- Junction Box (JB5)
- Left Air Conditioning System Controller (ACSC) (A87)
- Secondary Power Distribution Assembly (SPDA) 2 (A14)
- Data Acquisition Unit (DAU) 1 (A17)
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin:
- AW700-21-0160 - "PACK FAULT" CAS message while CAIMS / OMS is active
Forum Articles/Infoservice/Newsletter: None
Quick Links:
| Removal of the Flow Control Valves | AMM 21-51-25-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Flow Control Valves | AMM 21-51-25-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Compressor Pneumatic Overheat-Sensors | AMM 21-52-17-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Compressor Pneumatic Overheat-Sensors | AMM 21-52-17-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Air-Conditioning System Controllers | AMM 21-60-21-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Air-Conditioning System Controllers | AMM 21-60-21-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Junction Box JB5 | AMM 24-00-09-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Junction Box JB5 | AMM 24-00-09-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Secondary-Power Distribution Assemblies | AMM 24-62-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Secondary-Power Distribution Assemblies | AMM 24-62-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Data Acquisition Units (DAU) | AMM 31-42-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Data Acquisition Units (DAU) | AMM 31-42-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10-02 [ Global Express ] [ G5000 ] [ Global XRS ] |
Troubleshooting Recommendations:
- Gently tap on the left FCV. Did the valve move to the commanded position after tapping?
- Interchange Left FCV with Right FCV.
- If the system checks are good, replace the Left FCV and do close out.
- If the fault remains, continue with next step.
- For Intermittent Faults, Download ACSC NVMs send to CRC for analysis to see what is failure mode. Failed Open or Failed closed, on ground or in flight.
- Perform leak check of the sense line between FCV1 and CPNOH.
- Interchange CPNOH.
- If the system checks are good, replace defective CPNOH and do close out.
- If the fault remains, continue with next step.
- Interchange ACSC 1 with ACSC 2.
- If the system checks are good, replace ACSC 1 and do close out.
- If the fault remains, continue with next step.
- Interchange DAU 1 with DAU 2.
- If the system checks are good, replace DAU 1 and do close out.
- If the fault remains, continue with next step.
- Interchange SPDA 2 with SPDA 3.
- If the system checks are good, replace SPDA 2 and do close out.
- If the fault remains, continue with next step.
- Perform wiring checks of all wiring / circuits related to the FCV.
- If the wiring checks are not good, repair the defective associated wiring and do close out.
- If the wiring checks are good, continue with next step.
- Remove JB5 and check K22 operation .
- Perform a continuity check of JB5.
- If there is continuity, repair the defective associated wiring and do close out.
- If there is no continuity, continue with next step.
- Replace JB5.
- Do close out.
