06/03/19
Message Overview:
Fault Message:
CPC1 [NO DATA] /DAU3 [CH A] /WRG
Fault Code:
2137328ABG
Associated CAS:
| Reporting LRU: | Cabin Pressure Controller (CPC) 1 |
| System Description: | 21-31-00 |
| Schematic Diagram: | 21-31-00 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wiring Diagram: | 31-42-07 [ Global Express ] [ G5000 ] [ Global XRS ] |
Fault Description:
The Cabin Pressure Controller (CPC) 1 does not receive the ARINC 429 signal from Data Acquisition Unit (DAU) 3A.
Possible Causes:
- Data Acquisition Unit (DAU) 3 (A30)
- Data Acquisition Unit (DAU) 3 Channel A
- Junction Box 3 (JB3)
- Cabin Pressure Controller (CPC) 1 (A21)
- Associated Wiring
Troubleshooting Tips:
Advisory Wire/Service Bulletin: None
Forum Articles/Infoservice/Newsletter: None
Quick Links:
| Removal of the Cabin Pressure Controllers | AMM 21-31-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Cabin Pressure Controllers | AMM 21-31-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Junction Box JB3 | AMM 24-00-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Junction Box JB3 | AMM 24-00-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Removal of the Data Acquisition Units (DAU) | AMM 31-42-01-000-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Installation of the Data Acquisition Units (DAU) | AMM 31-42-01-400-801 [ Global Express ] [ G5000 ] [ Global XRS ] |
| Wire Repair - Maintenance Practices - ALL | SPM 20-12-10 [ Global Express ] [ G5000 ] [ Global XRS ] |
Troubleshooting Recommendations:
- Swap DAU 3 with DAU 4.
- If the system checks are good, replace the DAU 3 and do close out.
- If the fault remains, continue with next step.
- Swap CPC 1 with CPC 2.
- If system checks are good, replace the CPC 1 and do close out.
- If fault remains, continue with next step.
- Perform wiring checks of the wires between CPC 1 and JB3.
- If the wiring checks are not good, repair the defective associated wiring and do close out.
- If the wiring checks are good, continue with next step.
- Perform wiring checks of the wires between JB3 and DAU 3.
- If the wiring checks are not good, repair the defective associated wiring and do close out.
- If the wiring checks are good, continue with next step.
- Perform continuity check of JB3.
- If there is continuity, repair the defective associated wiring and do close out.
- If there is no continuity, continue with next step.
- Replace JB3.
- Do close out.